Cresson’s Sundance authorization and November roadwork
Signed council minutes document the October 13 vote, with current regional roadwork and dated service notices.
Council authorized the mayor to execute the Sundance agreement
Signed minutes now document a 4–0 council vote on October 13 authorizing the mayor to execute an agreement with Sundance Disposal, LLC. The same motion took no action on Ordinance 2026-005.
The vote establishes authorization. The records reviewed do not establish an executed contract, final customer rates, pickup days or a service-start date. No November 10 replat decision was verified; that meeting’s public detail page still links an agenda.
Signed October 13 council minutes → · The authorization and remaining service questions →. Rechecked November 14, 2026.
I-30: updated eastbound closure weekend, November 20–23
TxDOT’s current schedule lists eastbound I-30 closed between the I-20 interchange and Linkcrest Drive from 7 p.m. Friday, November 20, through 6 a.m. Monday, November 23, CST. The detour follows eastbound I-20, northbound I-820 West Loop and eastbound I-30; eastbound frontage-road access remains open.
The Walsh Ranch Parkway eastbound exit and entrance share that window. Exit via FM 1187/FM 3325 and the frontage road; entering traffic is directed to the Chapel Creek Boulevard entrance. A one-lane eastbound restriction on the same I-30 segment is listed for November 19, 7 p.m.–6 a.m.
Next week’s daytime work: TxDOT also lists a northbound FM 1187 right-lane closure across I-20 through the westbound frontage-road intersection, November 16–20 from 9 a.m. to 3 p.m. On November 16–21, from 9 a.m. to 3 p.m., the westbound I-30 exit to Spur 580/Linkcrest may close intermittently, and eastbound I-30 between Spur 580 and Chapel Creek Boulevard is scheduled to be reduced to one lane. These are separate restrictions from the November 20–23 full eastbound closure.
Schedule correction: the current list no longer contains the earlier eastbound November 13–16 window or the previously listed westbound November 20–23 full closure. It does not explain those changes. Other restrictions remain; this update does not establish that earlier work was completed or canceled. Check the live list before traveling.
TxDOT’s current west Fort Worth roadwork schedule → · Rechecked November 14, 2026; construction schedules may change.
Turn-lane work near Brookshire’s, November 12–13
Granbury scheduled the northbound turn lane at the gas station to Brookshire’s, from Morgan Street to Autumn Ridge, closed from 9 p.m. November 12 until 11 a.m. November 13, CST for infrastructure work. That announced window has passed. Actual reopening was not independently verified; this was a turn-lane advisory rather than an entire-road closure.
Bypass filming notice: November 11–12 window has passed
The City-posted plan scheduled the southbound US 377 bypass closure for 7 p.m. November 11 to 5 a.m. November 12, CST, with a US 377 Business detour and intermittent northbound/Old Granbury Road controls. That announced window has elapsed. Actual implementation and reopening have not been independently verified.
Loop 567: the November 8–10 restoration schedule is past
The October 28 city notice is now archived. Its last planned restrictions were restoration stops of up to 10 minutes, 7 a.m.–7 p.m. CST, November 8–10. A past schedule and an archived notice do not independently establish actual reopening or current traffic conditions.
Transit draft: the November 12 comment deadline is past
The regional draft identifies needs along US 377 toward Cresson. Read the dated draft, comment deadline and local connection →. A draft does not establish a new transit service.
Water and city records
Kelly Ranch’s October 27 boil-water rescission remains the latest checked notice for public water system TX1840225. It applies to that system; it is not a statement about every Cresson-area water provider.
The signed October 13 minutes now establish the Sundance authorization described above. Cresson’s November 10 agenda included possible action on a Bluebonnet Hills replat and approval of those earlier minutes. The reviewed November 10 detail page still provides an agenda, so its replat outcome remains unverified. Final Sundance rates and pickup arrangements also remain unverified.
District water notices → · Cresson meeting records →. City and district records reviewed November 14; original notice dates retained.